At this stop in the line, known as Station 2, pretty much all of the systems and equipment meant for the hull are installed. First, there's shot blasting and painting sessions, and then workers put it through one more reconditioning step, known as de-masking and de-taping.Īt this point, the hull heads down its own assembly line, at first sitting on the floor because its suspension system has yet to be added. And before the turret goes off to an assembly line where a series of additional systems and equipment are installed, workers first mount what's known as "the basket." This is the pod where the gunner, commander, and loader sit, along with about 2,000 pounds of electronics and other gear.įor the hull, the process is more or less the same. Next, plant workers install the tank's 120 mm main gun, making sure that the vehicle can properly absorb the recoil that comes with firing the gun.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |